Server and Data Centre Relocation, Planned Down to the Last Cable

Server and Data Centre Relocation, Planned Down to the Last Cable

Every cable labelled. Every rack reconnected exactly as it was.

Bishop’s Move – founding member of the British Association of Removers, relocating UK businesses since 1854.

Moving servers leaves no room for guesswork, so we label every cable and audit every rack before anything is unplugged. At the new site, we use that same documentation to reconnect your equipment exactly as it was. Server and data centre relocation is a specialist service within our removals company, which has over 170 years of experience. It’s run by the same team that manages the rest of your move.

diagonal-detail
Need to know more?
Media Text Image Vertical lines

Whether you’re moving within the same building or to a new site across the country, every project starts with a full scoping exercise. We gather everything we need to know about your racks, cabling, power feeds and access, then build a relocation schedule around the technical, logistical and business needs of your move.

The move itself follows six steps: 

1. Full scoping exercise specific to your site

2. Every connectivity and power feed labelled and documented before a single cable is removed, with rails and cable management arms labelled and packed alongside the equipment 

3. Servers and racks packed into lined, purpose-built server cases designed specifically for moving servers 

4. Transport in vehicles built for fragile equipment, with tracking systems that can be accessed throughout the journey

5. Re-racking and reconnection at the new site, following the same documentation used to take it apart

6. Handover to your team for power-up and testing, with our team on hand to help with any issues after the move

We build the schedule around your operational hours. Evening and weekend moves are standard practice for us, not a premium add-on.

Media Text Image Vertical lines

A data centre move follows the same method as a server room relocation, at a bigger scale and with less room for error. There are more racks, more power and connectivity to document, and usually more people who need to sign off each stage.

We plan data centre relocations in phases, agreeing with you the order racks move in and what needs to stay live at each stage, so your operations aren’t waiting on one big cutover. Every phase uses the same labelling, audit and recommissioning documentation described above, and we agree access, power and timing with your facilities and IT teams before anything is unplugged. You keep control of network configuration and testing, while we manage the physical move.

Media Text Image Vertical lines

Most companies choose between a generalist removals firm and a specialist IT contractor for a server move. Bishop’s Move is built to be both at once. The same project managers who plan your wider business relocation also plan the server room, so your IT move isn’t a second, separately run project bolted onto the desk moves and furniture. It’s one project, one point of accountability, and one team that already understands your site, your timeline and your access constraints before the server cases arrive.

That matters most on high-stakes projects like trading floors, hospital departments and university teaching schedules. We’ve run all three.

diagonal-detail
Make an Enquiry

Natixis Corporate & Investment Banking needed 716 staff relocated across three phases at Cannon Bridge, including full decommissioning and recommissioning of trading desk IT. We scheduled the moves for evenings and weekends. Result: zero business disruption and a 100% IT recommissioning success rate. Read the Natixis case study.

Queen Mary University London needed two IT suites moved as part of a seven-phase, 12-month campus relocation covering 180 staff, spanning Whitechapel, Mile End and St Bartholomew’s Hospital. Teaching started on schedule in the summer term, with no delays to reinstallation. Read the Queen Mary case study.

University of Southampton Business School moved 210 staff and 1,100 crates in a single seven-day project, working through an old building with two unreliable lifts and restricted vehicle access. The project caused zero disruption to university activities. Read the Southampton case study.

Your IT relocation might cover more than the server room alone. If desks, cabling and workstations are moving too, that’s the same team, the same project, one schedule.

Our Commitment to Excellence
Our Commitment to Excellence
Our Commitment to Excellence
Our Commitment to Excellence
Our Commitment to Excellence
Our Commitment to Excellence
diagonal-detail
Get a Quote